亚洲福利在线视频-亚洲妇女无套内射精-亚洲妇熟xxxxx妇色黄-亚洲妇熟xxxx妇色黄-亚洲干综合-亚洲高清不卡视频

您好,歡迎訪問濟(jì)南液壓升降機(jī)械銷售中心官網(wǎng)!

濟(jì)南液壓升降機(jī)械銷售中心

 多年以來一直專注于生產(chǎn)銷售液壓升降機(jī)械設(shè)備

全國24H熱線服務(wù)電話:

152-5313-4653

您當(dāng)前的位置 :首 頁 > 客戶案例 > 交流電和直流電兩用型升降舞臺操作方式解析

聯(lián)系我們Contact Us

濟(jì)南液壓升降機(jī)械銷售中心

聯(lián)系人:安經(jīng)理

電話:152-5313-4653

郵箱:347299818@qq.com

網(wǎng)址:www.inductor-china.com

地址:山東省濟(jì)南市濟(jì)北開發(fā)區(qū)

交流電和直流電兩用型升降舞臺操作方式解析

2022-11-16 16:13:18
875次

升降舞臺操作方式為電動式,上升時按“上升”按鈕,下降時按“下降”按鈕,平臺臺面上和平臺控制箱上均有操作按鈕,操作時至少2人操作,1人地面,1人平臺臺面上。充電完成:關(guān)閉“外接電源開關(guān)”并拔下外接電源插頭,使用行走功能。
Lifting stage operation for electric type, press "up" button to rise, according to the "down" button down, have the operation button platform table and platform control box, the operation of at least 2 operation, 1 floor, 1 people on the platform surface. Charging complete: close the external power switch and pull off the external power plug, the use of walking function.

使用外接電源時:先關(guān)閉平臺控制箱內(nèi)部的“24V電源開關(guān)”,再打開控制箱內(nèi)部的“220V電源開關(guān)”,然后插上外接電源插頭,方可正常使用。
The use of an external power supply: first off the platform control box inside the "24V power switch, then open the control box" internal "220V power switch", and then plug the external power plug, can be normal use.

使用升降舞臺時:先關(guān)閉控制箱內(nèi)的“220V電源開關(guān)”,拔下外接電源插頭,再打開控制箱內(nèi)的“24V電源開關(guān)”方可正常使用,再打開平臺外側(cè)的“電瓶電源開關(guān)”方可使用行走功能,利用倒順開關(guān)控制行走、后退,握住牽引桿轉(zhuǎn)向把手,緩慢擰動油門線,使升降臺實現(xiàn)前走或后退,轉(zhuǎn)彎等功能。
The use of lifting stage: the first close the control box "220V power switch", unplug the external power plug, then open the control box of the "24V power switch" can be normal use, then open the platform outside of the "battery power switch" can be used for walking function, the use of reverse switch control, walking back, hold traction rod steering handle, slow twist throttle line, make the lifting platform to achieve ahead or back, turning function.

使用升降舞臺時,當(dāng)設(shè)備出現(xiàn)升降緩慢或點擊明顯無力時,需及時給電瓶充電。充電時先把24V電源開關(guān)關(guān)閉,然后打開220V電源開關(guān),把外置插頭插入220V電源中,即實現(xiàn)充電,注意:充電時嚴(yán)禁升降臺操作作業(yè)!電瓶充電時間嚴(yán)禁超過8小時。
Using the lifting stage, when the equipment lifting slowly or click on the obvious weakness, the need for timely to charge the battery. When charging the first 24V power switch off, then open the 220V power switch, plug the plug into the 220V power supply, namely realizing charging, note: lifting platform operation is prohibited when charging the battery charging time is strictly prohibited! More than 8 hours.

使用前請先空車試機(jī)、運(yùn)行正常方可上人使用!操作員需經(jīng)過培訓(xùn)考核后方可從事平臺操作!平臺未撐支腿嚴(yán)禁使用!斜坡嚴(yán)禁使用!

升降舞臺http://www.inductor-china.com/

 

快速導(dǎo)航

· 產(chǎn)品展示                · 客戶案例              

· 廠容廠貌                · 新聞動態(tài)              

· 行業(yè)知識                · 常見問題             

· 關(guān)于我們                · 聯(lián)系我們             

聯(lián)系我們

公司名稱:濟(jì)南液壓升降機(jī)械銷售中心

聯(lián)系人:安經(jīng)理

電話:152-5313-4653

郵箱:347299818@qq.com

網(wǎng)址:www.inductor-china.com

地址:山東省濟(jì)南市濟(jì)北開發(fā)區(qū)

手機(jī)移動端

微信掃一掃

主站蜘蛛池模板: 国产欧美精品一区二区三区| 国产免费久久精品99久久| 欧美观看一级毛片| 日日人人| 亚洲国产精品成人综合久久久 | 日本中文字幕永久在线| 性生活视频网址| 伊人久久国产精品| 激情在线观看视频| 美国毛片aaa在线播放| 青娱乐伊人| 四虎影视在线看免费观看| 亚洲欧美日韩综合一区久久| 中午字幕在线观看| www成人在线观看| 国产精品_国产精品_国产精品| 久久只有精品视频| 欧美午夜性刺激在线观看免费| 手机看高清特黄a大片| 亚洲国产精品一区二区首页 | 日本人一级毛片视频| 特级中国aaa毛片| 亚洲精品播放| 一级毛片特级毛片免费的| 99爱视频在线| 成人精品视频在线观看播放| 国产九九精品| 黄色.www| 久久成人精品| 久久综合一区二区三区| 欧美日韩精品一区二区在线线| 日韩中文字幕精品视频在线| 天天综合天天综合| 亚洲欧美国产精品久久久| 在线观看免费精品国产| 91热在线观看精品| riav久久中文一区二区| 国产成人精品午夜| 国产欧美亚洲另类第一页| 精品久久久久久中文字幕女| 久久久小视频|